设计阶段在水利水电工程造价形成过程中具有决定性影响,设计方案合理性、设计深度及设计管理水平直接关系工程投资规模。设计方案缺乏优化、设计变更频繁及造价控制意识不足,容易导致工程成本增加。基于工程造价管理视角,分析设计阶段影响工程造价的主要因素,探讨设计优化、限额设计及设计管理机制在造价控制中的实施方式。通过强化设计阶段造价控制措施,提升工程投资决策科学性,实现水利水电工程建设资金的合理配置与高效利用。
The design stage plays a decisive role in
the formation of project cost in water conservancy and hydropower projects. The
rationality of the design scheme, the depth of design, and the level of design
management are directly related to the scale of project investment. A lack of
design optimization, frequent design changes, and insufficient awareness of
cost control are likely to lead to increased project costs. From the
perspective of project cost management, this paper analyzes the main factors
affecting project cost during the design stage and discusses the implementation
of design optimization, quota-based design, and design management mechanisms in
cost control. By strengthening cost control measures at the design stage, the
scientific basis of investment decision-making can be improved, thereby
realizing the rational allocation and efficient utilization of construction
funds for water conservancy and hydropower projects.
[1]胡静. 水利工程设计阶段造价风险分析[J].黑龙江水利科技,2025,53(08):169-172+176.
[2]王帅,苏晴. 探究施工组织设计对水利水电工程造价的影响[J].水上安全,2024,(13):26-28.
[3]詹志琴. 水利工程设计阶段造价影响因素评价[J].水利科技与经济,2024,30(03):102-106.
[4]储正刚. 水利水电工程施工组织设计与工程造价关系浅析[J].黑龙江水利科技,2023,51(12):183-186.
[5]杨朝碧. 新时代水利工程设计阶段造价控制策略研究[J].中国招标,2023,(07):144-145.