Analysis of Optimization Countermeasures for Engineering Cost Management in New Energy Photovoltaic Power Generation Projects
新能源光伏发电项目工程造价管理优化对策分析

作者: 孔彦清 单位:广西龙桂绿能工程咨询有限公司

*通讯作者:

发布时间: 2026-04-09 总浏览量: 14

摘要

近年来,伴随着世界范围内能源结构转型升级进程加快以及国家双碳目标推进力度加大,光伏电站建设工程迎来大建设阶段。项目工程建设造价管理水平的高低决定了其投资回报大小以及长期发展的潜力,在实际过程中存在着前期论证深度不够,项目建设过程控制不到位等一系列问题阻碍着项目的经济效益最大化。本文全面分析了光伏项目工程造价管理存在的特征和瓶颈,从投资项目决策,设计,采购,施工以及运维等一系列重要环节进行了详细的研究,从而在加强前端管理力度,建立实时监测管理体系,制定合理采购计划和建立健全风险分担合同协议四个方面提出了切实可行的改进方案。并通过在人才队伍、科学技术、宏观环境以及思想意识等方面的措施探讨相应的落实条件并对今后的发展趋势做出一定的展望,力求能够为提高光伏项目工程的投资管理能力提供思路借鉴与参考意见。

关键词: 光伏发电;工程造价;全过程管理;成本控制;优化对策

Abstract

In recent years, with the accelerated global transformation and upgrading of the energy structure and the intensified promotion of China’s “dual carbon” goals, photovoltaic power station construction has entered a stage of rapid development. The level of engineering cost management in project construction directly determines investment returns and long-term development potential. In practice, however, a series of problems, such as insufficient depth in preliminary demonstration and inadequate control during project construction, have hindered the maximization of project economic benefits. This paper comprehensively analyzes the characteristics and bottlenecks of engineering cost management in photovoltaic projects, and conducts a detailed study of key stages including investment decision-making, design, procurement, construction, and operation and maintenance. On this basis, it proposes practical improvement measures in four aspects: strengthening front-end management, establishing a real-time monitoring and management system, formulating reasonable procurement plans, and improving risk-sharing contractual arrangements. In addition, the paper discusses the corresponding implementation conditions from the perspectives of talent development, science and technology, the macro environment, and managerial awareness, and provides a forward-looking perspective on future development trends, with the aim of offering useful insights and references for improving investment management capabilities in photovoltaic engineering projects.

Key words: photovoltaic power generation; engineering cost; whole-process management; cost control; optimization countermeasures

参考文献 References

[1]黄隆夏.光伏工程的造价管理与成本控制[J].工程建设与设计,2023,(23):262-264.

[2]崔建峰.光伏项目的工程造价管理策略研究[J].应用能源技术,2025,(04):106-108.

[3]孙晓庆.光伏工程的造价管理及成本控制探讨[C]江西省工程师联合会.第二届智能工程与经济建设学术研讨会论文集(二).中国水利水电第十二工程局有限公司;,2025:632-634.

[4]马青梅,马嘉骏.关于光伏项目基础选型造价对比分析及策略[J].电气技术与经济,2024,(10):233-235.


引用本文