Analysis of Risk Prevention Paths for Project Cost under Unbalanced Bidding
不平衡报价造价风险防范路径分析

作者: 姜莹莹 单位:衢州市政府投资项目评审中心

*通讯作者:

发布时间: 2026-07-13 总浏览量: 9

摘要

基于工程量清单计价模式条件下,部分施工企业为获得高额利润,便会采用不平衡报价的方法,扰乱造价的内部 形成逻辑,引发投标价失真、施工中造价急剧上升等风险。因此,为有效防范上述风险,本文将基于不平衡报价的类 型,分析不平衡报价引发的造价风险,最后从招标前、施工中、结算阶段三个方面,研究风险防范策略,希望加强风 险防控效果,形成高效、稳定的治理闭环。 

关键词: 不平衡报价;造价;风险;防范措施

Abstract

 Under the bill of quantities pricing model, some construction enterprises may adopt unbalanced bidding methods in order to obtain high profits, thereby disrupting the internal formation logic of project cost and causing risks such as distorted bid prices and a sharp increase in project cost during construction. Therefore, in order to effectively prevent the above risks, this paper analyzes the cost risks caused by unbalanced bidding based on its main types. It then studies risk prevention strategies from three aspects: the pre-tendering stage, the construction stage, and the settlement stage. The aim is to strengthen the effectiveness of risk prevention and control and form an efficient and stable closed-loop governance mechanism.

Key words: unbalanced bidding; project cost; risk; prevention measures

参考文献 References

[1]李友海.建筑工程招投标阶段造价风险识别与防范[J].中国建筑金属结构,2026,25(7):157-159. 

[2]贾宪.建筑工程招投标阶段的造价控制与不平衡报价防范研究[J].中文科技期刊数据库(全文版)经济管理,2025(8):179-182. 

[3]施秀凤.工程量清单模式下不平衡报价实施路径分析[J].中文科技期刊数据库(全文版)工程技术,2022(10):106-109. 

[4] 万梁龙.如何防范不平衡报价风险[J].中国招标,2022(4):97-98. 

[5]魏昀达.建筑工程项目不平衡报价产生的原因分析与防范应对措施探讨[J].中外建筑,2010(7):141-142. 