本文立足村镇流域污水治理项目现场施工特性,系统梳理项目施工进度管控与工程量审核管理中的现存痛点与核 心问题,从进度精细化管控、工程量全流程审核、现场协同管理、制度机制完善等多个维度,提出一套适配村镇项目、 可落地、可实操的管控策略与管理体系,旨在破解村镇污水治理项目施工管控难题,保障项目按期、保质、低成本完 成建设,为同类村镇流域污水治理工程的施工管理、造价管控、项目提质增效提供理论参考与实践支撑。
Based on the on-site construction characteristics of sewage treatment projects in village and town watersheds, this paper systematically reviews the existing pain points and core problems in construction progress control and quantity verification management. From multiple dimensions, including refined progress control, whole-process quantity verification, on-site collaborative management, and improvement of institutional mechanisms, a set of practical and implementable control strategies and management systems suitable for village and town projects is proposed. The aim is to solve construction management difficulties in village and town sewage treatment projects, ensure that projects are completed on schedule, with guaranteed quality and at low cost, and provide theoretical references and practical support for construction management, cost control, and project quality and efficiency improvement in similar sewage treatment projects in village and town watersheds.
[1]杨锦星.乡村振兴背景下的污水治理项目质量管理评价和提升研究[D].广东工业大学,2023.
[2]高银元.海南农村生活污水治理EPC项目中的施工成本管控[J].工程建设与设计,2021,(8):162-164.
[3]李杰,张乐,林洪能.极端拥挤环境下的污水管网项目实施管理[J].福建建材,2026,(4):76-80.
[4]谢家源.农村生活污水项目施工质量风险控制与管理策略研究[J].城市建设理论研究(电子版),2025,(31):64-66.